Dredging in Eclectic

Slips, channels, and ponds priced off the published cost guide. Call (334) 610-0188 or send the form below.

Eclectic calls itself the front porch of Lake Martin, and the south shore it anchors is the shallowest developed water on the lake. Kowaliga Bay and the Real Island sloughs were flats before Martin Dam flooded them in 1926, so a slip here might have been dug with 5 feet to spare where the north shore had 20. When silt takes a foot of that, the boat stays on the lift all summer.

That geometry makes the south shore our steadiest work. A suction pass that restores 2 feet of depth turns a slip from marginal back to usable, and because the flats are soft silt rather than packed clay, the pumping goes quickly once the tubes are staged. Single slips around Eclectic hold the published $2,500 to $6,000 range, with approach lanes out to open water adding $1,500 to $3,500 when the flat has crept past the boathouse mouth.

Every job below the Alabama Power contour gets its shoreline permit and Corps coverage filed first. On the south shore that filing often includes the approach lane, and we scope the whole path to navigable depth in one permit so you are not paying for paperwork twice.

Why south shore grass keeps returning

Real Island sloughs grow grass beds on top of their silt, and owners sometimes treat the weeds and think the problem is solved. The grass is a symptom. It roots because the slip got shallow enough for sunlight to reach bottom, and it comes back every year until the depth does. Dredging removes the bed and the root zone in the same pass.

Kowaliga to Real Island coverage

Around Eclectic the calls come from Kowaliga Bay, Real Island, Children’s Harbor, Kowaliga Marina, covering ZIP 36024. If your water is near those, odds are we have sounded a bottom within sight of it.

Check a slip near Eclectic

The address and what the water is doing get the fastest answer. Every number comes off the public table.

Free written quote · Published pricing · Permits handled before work starts

We can take 3 more dredge projects this season.

South shore questions, answered plainly

My slip has weeds growing in it now. Is that a dredging problem?

Usually yes. Lake grass roots where silt has raised the bottom into the sunlight, and cutting or spraying it treats the symptom for one season. Pulling the sediment layer out takes the root zone with it and puts the depth back, which is why dredged slips stay clean for years.

How long does a single slip dredge take at Kowaliga?

Pumping itself usually runs one to two days for a single slip. The full calendar is longer, two to six weeks for the Alabama Power and Corps paperwork up front and a few weeks for the dewatering tubes to drain before spoil is moved. We give you the whole timeline in the written quote.

Can you dredge a lane from my boathouse out to deep water?

Yes, approach lanes are standard on the south shore where the flat extends past the slip. We sound the route, dredge a lane 4 feet deep at winter pool, and permit the lane and slip together. The lane typically adds $1,500 to $3,500 to a slip job.

Auburn Dredging works all the water between Auburn and the lakes. See the cost guide, the permit explainer, or nearby areas: Dadeville, Alexander City, Jacksons Gap.

Get a depth check(334) 610-0188